Bhopal Bridge Controversy: Engineers Suspended, Companies Blacklisted After 90-Degree Design
Following an investigation into the flawed design of the Aishbagh RoB in Bhopal, Madhya Pradesh, the government has taken action. Seven engineers, including two Chief Engineers, have been suspended due to the construction’s serious negligence. The construction agency and design consultant have been blacklisted. A committee has been formed to address the technical issues of the bridge, with plans to modify the sharp 90-degree turn and expand the bridge’s width once additional land is secured.